Future LNG Regasification Terminals (2026–2035): 230 MTPA

Sep 25
3 min read

19 August 2026


Capacity balance: Regasification vs Liquefaction — 2.1× → 0.9×. Why?


  • 2025: Liquefaction capacity 525 MTPA vs regasification capacity 1,114 MTPA — 2.1×

  • Future additions: Liquefaction capacity 250 MTPA vs regasification capacity 230 MTPA — 0.9×


Projects: 94 MTPA | 25 projects


  1. Under construction: 64 MTPA — 14 projects

  2. Advanced pre-FID: 25 MTPA — 8 projects

  3. Early-stage concepts: 5+ MTPA — 3 projects


Innovations


  1. Phased terminal development

  2. Shared port and pipeline infrastructure

  3. Multi-molecule energy hubs

  4. Offshore and jettyless LNG transfer systems


Onshore or FSRU?


  1. Market — baseload, seasonal or peak gas demand

  2. Capacity — required send-out and gas-grid limitations

  3. Storage — cargo size, delivery frequency and supply buffer

  4. Site conditions — metocean, water depth, dredging and land availability

  5. Schedule and commercial model — permanent CAPEX or charter-based fast-track deployment


I. Under construction — 64 MTPA

🇨🇳 2026: Sinopec Longkou — 5.0 MTPA, 880K m³

🇮🇶 2027: Khor Al Zubair — 3.8 MTPA, 170K m³ (FSRU)

🇩🇪 2027: Brunsbüttel Permanent Terminal — 5.9 MTPA, 330K m³

🇰🇷 2027: KOGAS Dangjin — 6.0 MTPA, 1.08M m³

🇦🇺 2027: Port Kembla — 2.4 MTPA (FSRU)

🇧🇸 2027: New Providence LNG Terminal — Jettyless floating terminal

🇨🇴 2027: Puerto Bahía — 2.3 MTPA (jettyless FSRU)

🇮🇳 2028: Gopalpur — 5.0 MTPA

🇵🇱 2028: Gdańsk FSRU 1 — 4.5 MTPA, 170K m³

🇩🇪 2029: Hanseatic Energy Hub, Stade — 9.8 MTPA, 480K m³

🇹🇼 2029: Mailiao — 3.0 MTPA, 320K m³

🇹🇭 2029: Map Ta Phut Phase 3 — 8.0 MTPA

🇹🇼 2030: Kaohsiung Intercontinental — 6.0 MTPA, 720K m³

🇨🇾 Vasilikos LNG Terminal — 2.0 MTPA (floating terminal redevelopment)

II. Advanced pre-FID — 25 MTPA

🇮🇳 2027–2028: Haldia — 1.5 MTPA (floating terminal)

🇳🇱 2028: EemsEnergyTerminal Extension — 6.3 MTPA (floating terminal)

🇿🇦 2028 (FID): Zululand Energy Terminal, Richards Bay — 2.0 MTPA, ≥135K m³ (FSU + onshore regasification)

🇦🇺 2028–2029: Viva Energy Geelong — 3.0 MTPA, 160K–180K m³ (FSRU)

🇳🇱 2029: Zeeland Energy Terminal — 5.5 MTPA, ≥180K m³ (FSRU)

🇵🇱 2031–2032: Gdańsk FSRU 2 — 3.3 MTPA

🇿🇦 2035: Port of Ngqura — 3.6 MTPA

🇳🇿 Port Taranaki LNG — Floating terminal

III. Early-stage concepts

🇱🇰 Sri Lanka LNG Import Terminal, Kerawalapitiya — Floating terminal

🇧🇩 Bangladesh Third FSRU, Moheshkhali — 4.5 MTPA

🇲🇦 Nador West Med — 3.8 MTPA, ≥160K m³ (FSRU concept; on hold)


Methodology


  1. “Under construction” includes construction, commissioning, terminal redevelopment and final FSRU deployment. “Advanced pre-FID” includes pre-FEED, FEED, permitting, conditional FID, procurement and commercial development. “Early-stage” covers feasibility and initial development concepts.

  2. Years indicate expected start-up unless marked FID. Projects without a reliably disclosed schedule are listed without a year.

  3. The list includes projects with sufficient public information on development status, schedule or capacity. Undisclosed and on-hold capacity is excluded from the MTPA totals.

  4. Installed liquefaction and regasification capacities follow the IGU World LNG Report. Future additions use the IEA Global LNG Capacity Tracker for liquefaction and the IGU project pipeline for regasification.

  5. Units: Regasification capacity is expressed in MTPA and LNG storage in m³ (K = thousand; M = million). For indicative conversion, 1 MTPA ≈ 133 MMscf/d; therefore, 4.5 MTPA ≈ 600 MMscf/d.


Sources


  1. International Gas Union — World LNG Report

  2. International Energy Agency — Global LNG Capacity Tracker

  3. GIIGNL — Annual Reports

  4. National energy ministries and port authorities

  5. Terminal developers, FSRU owners and project operators

  6. Regulatory filings, procurement notices and company announcements

  7. Publicly available project information as of August 2026


Industry feedback, additional public data and corrections are welcome.

For LNG Regasification Capacity History (1964–2025), please refer to:

© Alexei Bykov / REBDUK | www.rebduk.com — Original research and analysis. Feel free to reference or share — we would just appreciate a credit and a link back to the original article

 
 
 

Comments


Featured Posts
Recent Posts
Archive
Search By Tags
Related posts

© 2017 by REBDUK Registered in England and Wales No: 7091121

  • Facebook Social Icon
  • X
  • Instagram Social Icon
  • LinkedIn Social Icon
bottom of page