

Onshore Gas Pipeline CAPEX (2005–2030)
14 August 2026 Onshore Gas Pipeline CAPEX (2005–2030) Key facts: • Conventional: $4.5M/km (15 projects) • Mountains: $15.1M/km (4 projects) • Arctic/Sub-Arctic: $7.9M/km (4 projects) Conventional 🇺🇸 2008 — Southeast Supply Header | 435 km | 42″ | $3.6M/km 🇺🇸 2009 — Gulf Crossing | 568 km | 42″ | $3.0M/km 🇺🇸 2011 — Tiger Pipeline | 282 km | 42″ | $5.5M/km 🇺🇸 2011 — Fayetteville Express | 301 km | 42″ | $4.8M/km 🇺🇸 2017 — Trans-Pecos + Comanche Trail | 544 km comb


The Next EPC Super-Cycle: Energy for AI
Saudi Arabia's New Energy Export Summary: The next EPC super-cycle is about AI: Saudi Arabia is betting on cheap power ($0.01/kWh), land, and state will to become a global AI hub and exporter of compute. The time for giga-projects is now. The driver of the next infrastructure wave won't be molecules or electrons—it will be algorithms . Saudi Arabia isn't just adopting AI; it's executing a sovereign strategy to pivot its entire economic export model from barrels of oil to t































